15A NCAC 04B .0130      EMERGENCIES

Any person who conducts an emergency repair essential to protect human life that results in a land‑disturbing activity within the meaning of G.S. 113A‑52(6) and these Rules shall take the following actions:

(1)           notify the Director, or his or her designee, of the repair as soon as possible, but no later than five working days after the emergency ends; and

(2)           take all measures necessary to protect all public and private property from damage caused by the repair as soon as possible, but no later than 15 working days after the emergency ends.

 

History Note:        Authority G.S. 113A‑52.01(4); 113A‑54(b);

Eff. October 1, 1995;

Readopted Eff. April 1, 2020.